References

LUŠTICA BAY, Tivat – Phases C, D, G and F
Delivery of the equipment, installation and commissioning of the complete thermotechnical installations and fire protection system in the super luxury tourist village “Luštica Bay”.
The facilities of the phases C and D, area cca 10.000m2, are based on air-to-water heat pumps supplying the powered floor heating, fan-coil units and water heaters to heat the sanitary hot water.
Facilities of the phases G and F, cca 14.000m2, are based on Freon air conditioning systems.
The garages of the complex are covered with stabile sprinkler systems, smoke removal and ventilation systems.

EMBASSY OF THE UNITED STATES, Podgorica
Delivery of the equipment, installation and commissioning of the air conditioning and ventilation, water supply and sewerage; installation of fire protection in the American Embassy building in Podgorica.
Air conditioning and ventilation of the facility are based on air conditioning system chamber- heat pump, which are specific for maintaining the temperature pressure parameters and air quality, by using VAV boxes and sophisticated management system.

PORTO MONTENEGRO, Tivat – Building UP1-11
Delivery of the equipment, installation and commissioning of the complete thermotechnical and fire protection installations in the Building UP1-11, within super luxury nautical village Porto Montenegro.
Air Conditioning of the apartments is based on usage of Freon systems of mini VRF series, in ordinary and heat-recovery versions. Usage of the channel units enabled high level of spatial aesthetics in addition to comfort.
Garages are covered by a stable complex sprinkler system, smoke removal and ventilation systems.

OLYMPIC POOL, Nikšić
Delivery, installation and commissioning of the heating substation with water to water heating pumps, power 2 x 550KW, well pumps with auxiliary feeding lines, heat exchanger of the pool water, floor heating and ventilation system, as well as regulation and safety equipment which is required for reliable and automatic work of the entire system.
The Hall ventilation system and auxiliary premises consist of s pool chamber which flow is 70.000m3 / h, channel network and regulatory-distribution elements.

Open Pool of Water polo Swimming Club (WSC ) „JADRAN“, Herceg Novi
Delivery, installation and commissioning of the heating substation with water to water heating pump, power 1 x 550KW, pumps of the sea water with the following feeding lines, heat exchangers of the pool water, floor heating and fan-convectors, as well as regulation-safety equipment necessary for the reliable and automatic work of the entire system. The auxiliary premises of the open pool, fitness center and offices are air conditioned by usage of the central VRV system.

Hotel „MAESTRAL“, Budva
Delivery, installation and commissioning of the fire protection installations and LPG installations.
Fire protection is based on the usage of sprinkler installation, which consists of the tank, pump station, distribution network and nozzles for extinguishing with the water flow. LPG Installation is used for supplying the consumers in the kitchen, and it consists of the transfusion bridge, storing tank for LPG, evaporation- reduction station and pipelines to the consumers.

Hotel „AVALA”, Budva
Delivery of the equipment, installation and commissioning of the fire protection and LPG installations.
Fire protection of one of the best hotels at the Montenegrin seaside, which besides 250 residential units has the restaurants and casinos, SPA center and other, is based on the usage of sprinkler fire protection system which consists of the accumulation tank, sprinkler pump station, distribution network and nozzles for water flow extinguishing.
LPG installation is used for supplying the consumers in the kitchen, and it consists of the transfusion bridge, storing tank for LPG, evaporation-reduction station and distribution network to the consumers.

BUS STATION, Tivat
Delivery, installation and commissioning of the installations for thermotechnical and fire protection, which consist of the central VRF air conditioning system with appropriate number of the internal cluster and channel units of the ventilation system for commercial premises, with the usage of heat recuperators and additional distribution-regulation elements and stabile sprinkler system for fire extinguishing.

Hotel „TREBJESA“, Nikšić
Delivery, installation and commissioning of thermotechnical installations in the Hotel facility.
The boilers which are using the light fuel oil are heating the facility through radiators, as well as for the air preparation within the air chamber for ventilation of the commercial premises at the ground floor. Air conditioning is based on the usage of the heat pump and subceiling fans-convectors. Heating of the sanitary hot water is based on the usage of solar system, while additional heating is done by usage of electrical heaters and boilers.

PORTO MONTENEGRO, Tivat – Museum of submarines
Delivery, installation and commissioning of the thermotechnical installations of the museum showpieces – submarines P-821 and P-912.
Air conditioning and ventilation of submarines is based on the usage of roof-top units (compact ventilation unit with integrated heat pump). Distribution of the prepared air is based on the usage of the part of existing ventilation channels of the submarine, and partially through new spiral-rebated lines.

Elementary and High Music School „DARA ČOKORILO”, Nikšić
Delivery, installation and commissioning of the heating and ventilation in the Music School. Heating of the facility is based on the usage of the boiler room with light fuel oil, which is feeding the radiator installations in the classrooms and mutual premises, boilers for the sanitary water, as well as the air chambers for the concert halls.

Innovation entrepreneurial center “TEHNOPOLIS” Nikšić
Delivery, installation and commissioning of the thermotechnical and fire protection installations of the facility. Heating and cooling system of the facility is made of central VRV system with the appropriate number of the internal units. Ventilation of the multimedia hall and other mutual premises is based on the usage of rescuperator with freon exchanger for additional air heating and cooling. The firefighting system consists of the stabile sprinkler installation. The Laboratories and testing centers are protected with OXEO systems for fire extinguishing (inert gas extinguishing system).

Vila „REŽEVIĆI“, Budva
Delivery, installation and commissioning of the thermotechnical installation of the complex consisting of VRV system for heating and cooling the premises of the facility.
Independent system air to water heat pump is used for the floor heating and sanitary water heating, as well as for the additional heating of the open pool water. Heat pump is also supplying the ventilation chamber with the heating/cooling energy. System contains the back-up boiler room with the light fuel oil boiler.

Hotel „LA ROCHE” Tivat
Delivery, installation and commissioning thermotechnical installations and fire protection installations in the Hotel. Thermotechnical installation consists of the heat-recovery VRV system (system for usage of the waste energy from the cooling cycle) which solved the air conditioning of the commercial premises on the ground floor and basement, as well as the heating of sanitary water. Ventilation of the commercial premises on the ground floor is based on the usage of the VRV system through the subceiling channel units. Fire protection system is based on the stabile sprinkler installation and smoke removal system for garages.

Hotel „FRANCA”, Tivat
Delivery, installation and commissioning of the thermotechnical and fire protection installations of the Hotel. Heating and cooling is based on the usage of VRV central system. Ventilation of the ground floor and basement premises is based on the ventilation chambers and heat recuperators. Heating of the sanitary water is based on the usage of solar system, while additional heating is done through the mono block air heat pump. Fire protection system consists of the stabile sprinkler installation.

WASTE WATER TREATMENT PLANT, Nikšić
Manufacture, delivery and installation of stainless steel distributive pipelines of the plant, dividing / collecting batteries, pipelines supports and equipment, crane rails, solid materials silo with the delivery system.
Heating and air conditioning of the administrative buildings, cooling of generator and server plants. Installation of mechanical equipment and regulation-safety reinforcement systems, connection to the pipelines, preparation of the systems for commissioning.

Brewery „TREBJESA” Nikšić
Delivery, installation and commissioning: Installation of the steam and condensates; Installation of ammonia and carbon dioxide; Distribution of the fluids for waste water treatment; System for usage of waste condensates’ heat; Mechanical installations in manipulative area of horizontal tanks, vessels for dosing daraclar, kieselguhr dispenser, deaerated water plant; Energy Efficiency Raising System; air conditioning and ventilation systems in the Bottling Plant.

Ironworks „TOSCELIK” Nikšić
Delivery, installation and commissioning: Distribution of the fluids for Blooming Mill; Distribution of the steam 15bar from the Energy Plant to SKF plant in the Melt Shop; Insulation of the Rotary Furnace; Distribution of the LPG gas for Rotary Furnace in the forging Mill; Compressor and Air Dryer; Distribution pipelines to the consumer- SKF in the Melt Shop.

Factory for the medicines’ production “HEMOMONT”, Podgorica
Delivery and Installation of mechanical installations (ventilation system, cooling chiller, pipelines of the hot water and steam consumers) in the new plant for sterile production of solutions. The air is prepared in the hygienic air chambers, thus through the network made of 30t of ventilation channels it is distributed to the clean laboratory rooms. Due to the specific production process, the pressure testing and permeability of the ventilation channels has been done, as well as the proving of parameters in the premises which are treated.

Pump Station „BREZNICA“, Pljevlja
Delivery, Installation and commissioning of the new highly-sophisticated pump aggregates together with the division / collection batteries, pipelines, regulation-safety reinforcements and feeding cabinets for automatic work of the plant. The works encompassed the replacement of the existing pump station with WILO pump aggregates type HELIX EXCEL driven with the ECM engines efficiency IE>4 of the latest generation. In this way, the hydraulic parameters have been raised, while the power of the pump aggregates has been decreased from 75KW to 32,5KW, together with the electrical energy consumption.

Energy Efficiency of the Public School Institutions

OŠ „Mileva Lajović Lalatović” Nikšić, OŠ „Braća Ribar” Nikšić, OŠ „Jagoš Kontić” Nikšić, OŠ „Milija Nikčević” Nikšić, OŠ „Maršal Tito” Ulcinj, SŠ „Bratstvo i jedinstvo” Ulcinj, SŠ „Dašo Pavičić” Herceg Novi, Srednja Stručna Škola Pljevlja, OŠ “Ristan Pavlović” Pljevlja, Gimnazija Bijelo Polje, OŠ “Bećo Bašić” Plav, OŠ “Mustafa Pećanin” Rožaje, Dom Učenika i studenata “Spasić Mašera” Kotor

Within the cooperation with the Ministry of Education and Science of Montenegro, and through the realization of KFW program for increasing energy efficiency of the public school institutions, we have delivered, installed and commissioned thermotechnical installations in the listed institutions, as follows: replacement of the boiler plants and following elements, reconstruction of the sanitary water heating system, replacement/reconstruction of the automatic regulation elements, replacement/blasting the pipeline, replacement of the radiator valves with the new ones- thermostats, replacement/blasting the radiators.
We are especially emphasizing the reconstruction of the thermotechnical installation in the Dormitory for the students „Spasić Mašera“ in Kotoru, which encompassed the delivery and replacement of the new boiler station of the dormitory (2 x 350KW boilers using light fuel oil, frequent circulation pump, regulation-safety elements, automation of the system), and installation of the new heating system for the sanitary water, consisting of 54 solar collectors, heat accumulator and following pump and regulation elements.

Energy Efficiency of the Public Health Institutions

Clinical Hospital Center of Montenegro, Institute for Children’s diseases Podgorica, General Hospital “Danilo I” Cetinje, Health Center Cetinje, General Hospital Kotor – Main Building and Children’s clinic, Health Center Kotor, Health Center Kolašin, Health Center Nikšić, Health Center Andrijevica, Health Center Petnjica

Within the cooperation of the Ministry of Health of Montenegro, and through the realization of the World Bank program for energy efficiency increase of the public health Institutions, we have done the following: delivery, installation and commissioning of the thermotechnical installations within the listed institutions: replacement of the boiler plants and following elements, replacement/reconstruction of elements for automatic driving, replacement/blasting of the pipelines, replacement of the radiator valves with thermostats, replacement/blasting the radiators, replacement of the boiler plants and following elements, replacement/reconstruction of the elements for automatic driving, replacement/blasting of the pipelines.
We would especially emphasize the works done on reconstruction of the thermotechnical system of the Clinical Hospital Center of Montenegro which encompassed the reconstruction of the main boiler plant (manufacture, delivery and installation of the new hot water and steam dividers-collectors of the main boiling station, replacement of reinforcements, regulation-safety elements, distribution pipelines), reconstruction of the fluid distribution (steam and hot water distribution from the main boiler station to the heating substations), reconstruction of the heating substations (replacement of heat exchangers water/steam, installation of new highly-efficient circulation pumps, regulation-safety elements, reinforcement, pipelines), reconstruction of distribution system in the facilities (repair of the pipelines, radiators blasting, installation of the automatic balance valves on the radiators).

The works on the installation of the central system of direct expansion (VRF system) for air conditioning consists of 13 external and 243 internal units, done in the “Institute for the children’s’ diseases”, Podgorica.

Take a look at complete reference list of Ening.

Company

  • About Us
  • Quality Policy
  • Why ENING?
  • Licenses and Accreditations
  • Employment
  • News

why ening

Production

MPE20&30, Data sheet 2018
Professional Hoods


Company

  • About Us
  • Quality Policy
  • Why ENING?
  • Licenses and Accreditations
  • Employment
  • News

Activities

  • Engineering and Design
  • Work Performance
  • Service and Maintenance
  • Technical control and testing
  • Trade
  • Production

Others

  • References
  • Partners
  • Green Solutions
  • ENING purpose loans
  • Energy Wood
  • MonteSol

Contact

ENING d.o.o
Straševina bb, PO Box 112, 81400 Nikšić, Montenegro
• Tel: +382 40 253 401
• Fax: +382 40 253 416
• E-mail: office@ening.co.me

 




Sasfesigned seal


© Copyright 2018, by: Green Studio
ENING d.o.o. Nikšić | PIB: 02214628 | PDV: 40/31-0086-1 | NLB: 530-11626-55 | HB: 520-21800-53 | Societe: 550-15276-39